Железнодорожные маршруты и торговые коридоры Ирана
Железнодорожные маршруты в Иран и из Ирана: станции, ж/д погранпереходы, ширина колеи и точки её смены, способ перегрузки, ответственные операторы и текущий статус каждого маршрута.
Опубликовано: Последняя проверка: Статус информации:Действует
Действующие линии, линии с ограниченным сообщением, строящиеся объекты и проекты обозначены отдельно; ни один проект не выдаётся за действующий маршрут. Перед бронированием уточните текущий статус у железной дороги или оператора.
Подробности приведены на английском до появления проверенного перевода.
The Iran–Turkey rail link runs through Razi (Iran) and Kapıköy (Turkey); inside Turkey wagons cross Lake Van on train ferries. Both networks use standard gauge, so no bogie exchange is needed. The Tehran–Van passenger train resumed in March 2025 after five years. During the 2026 war, bridges on the Tabriz routes were struck, and reports on whether services resumed conflict.
ДействуетConfidence: MediumIran–Turkmenistan–Uzbekistan rail route (Sarakhs)The Sarakhs rail crossing is where bogies are exchanged between Iran's 1,435 mm and Turkmenistan's 1,520 mm track. In December 2025 the first Iranian freight train, made up of Iranian-built wagons, transited Turkmenistan to Bukhara in Uzbekistan. Iran has announced a target to raise Sarakhs bogie-exchange capacity from 400 to 600 wagons per day. No official transit time or tariff has been published for this route.
ДействуетConfidence: MediumNorth–South eastern branch: Iran–Turkmenistan–Kazakhstan (Incheh Borun)This line links Kazakhstan directly to Iran via Turkmenistan; at the Akyayla (Turkmenistan)–Incheh Borun (Iran) crossing the gauge changes from 1,520 to 1,435 mm. A 62-container train from Russia reached Tehran's Aprin dry port on this route in 12 days in November 2025. Kazakhstan's railway said in March 2026 that the route was operating normally.
ДействуетConfidence: MediumIran–Russia rail routes (INSTC)Iran–Russia rail freight uses two routes: the eastern branch via Kazakhstan and Turkmenistan (operating) and the western branch via Azerbaijan to Astara, which is incomplete because the 162 km Rasht–Astara line is missing. Rasht–Astara construction has not started and, per the latest report (October 2026), is planned for 2027. The Caspian sea route complements these but is constrained by vessel shortages and falling water levels.
ДействуетConfidence: MediumIran–Afghanistan rail route (Khaf–Herat)The 1,435 mm standard-gauge Khaf–Herat line operates from Khaf to Rozanak station in Herat province (formal opening December 2020). Section 4 to Herat city is under construction; its second phase (47 km) began in September 2025. Turkmen-built 1,520 mm lines to Torghundi and Aqina connect Afghanistan to the CIS network.
ДействуетConfidence: MediumIran–Pakistan rail route (Zahedan–Mirjaveh–Taftan–Quetta)The Quetta–Taftan line reaches Zahedan via the Mirjaveh border; Zahedan is the break of gauge between Pakistan's 1,676 mm and Iran's 1,435 mm, where containers are transshipped. The ECO freight train (Islamabad–Tehran–Istanbul) started in 2009 and stopped in 2012; the two countries agreed in December 2025 to resume it, but regular operation has not been confirmed.
ДействуетConfidence: LowIran–Iraq rail link (Shalamcheh–Basra)There is currently no operating rail connection between Iran and Iraq. The 36 km Shalamcheh–Basra line is under construction; an Iranian official put progress at about 70% in September 2026, but other reports suggest early-stage implementation. The line is designed for passengers and pilgrims.
ПредложеноConfidence: MediumChina–Iran rail route (Southern Corridor)China–Iran trains transit Kazakhstan and Turkmenistan and unload at Tehran's Aprin dry port. Iran said 40 trains had arrived from China from the start of 2025 to December that year. A reported cost for a 40 ft container Xi'an–Tehran was USD 4,500. The China–Kyrgyzstan–Uzbekistan line is under construction and is not yet an operating option.
ДействуетConfidence: MediumSea–rail complements: Bandar Abbas, Chabahar and Caspian portsSouthern ports (Bandar Abbas/Shahid Rajaee) are linked to Iran's rail network but have been under a US naval blockade during 2026. Chabahar–Zahedan construction was reported complete in September 2026 but the line is not yet in operation. Caspian ports (Anzali, Amirabad, Nowshahr) have taken a larger share, but their capacity is limited.
ДействуетConfidence: MediumConflicting sources
Where sources disagree, both versions are shown.
- Tabriz–Van route: Dawn (14 April 2026) reported a Tehran–Van train departing on rebuilt tracks; The Maritime Executive (27 April 2026) said services did not appear to have resumed.
- Tehran–Mashhad (July 2026): The Sunday Guardian reported the Aq Tekeh Khan bridge reopened within 24 hours; Railway News (11 July) said no official reopening date had been disclosed.
- Shalamcheh–Basra: Shafaq News cited an Iranian official at 70% progress (September 2026); AGBI in August 2026 described Iraq as about to start work.
- ITI train: Arab News (May 2026) says service stopped in 2012 and resumption was agreed in December 2025; Anadolu reported a restart after 10 years in December 2021.
- Iran–Turkmenistan rail transit target: one Tehran Times report gives both 6.0 million tonnes (joint plan) and 4 million tonnes (railway head).
- Chabahar–Zahedan: Business Today reported construction complete in September 2026; GKToday dates track-laying completion to 16 August 2026. Earlier promises (March 2026) were missed.
- Rasht–Astara: the construction start date has shifted repeatedly; the latest report (Interfax, 15 October 2026) gives 2027. The same report gives the survey start as both May 2025 and early 2026.
Research snapshot dated: 2026-11-11 · Official sites that could not be reached during research: rai.ir (HTTP 403), irica.ir (no response), pmo.ir (no response), railwaygazette.com (HTTP 403), eurasianet.org (HTTP 403), corp.ady.az (HTTP 403)
Подготовлено исследовательской командой Глобал ГитиИсточники и методика