Iran–Turkey–Europe rail route (Razi–Kapıköy)
The Iran–Turkey rail link runs through Razi (Iran) and Kapıköy (Turkey); inside Turkey wagons cross Lake Van on train ferries. Both networks use standard gauge, so no bogie exchange is needed. The Tehran–Van passenger train resumed in March 2025 after five years. During the 2026 war, bridges on the Tabriz routes were struck, and reports on whether services resumed conflict.
النشر: آخر مراجعة: حالة المعلومات:سارية
Confidence: Medium
التفاصيل معروضة بالإنجليزية إلى حين توفر ترجمة عربية مراجعة.
الخطوط العاملة والخطوط ذات الخدمة المحدودة والمشاريع قيد الإنشاء والمقترحات مصنفة بشكل منفصل؛ لا يُعرض أي مسار مقترح كمسار عامل. تحقق من وضع المسار لدى السكك الحديدية أو المشغل قبل الحجز.
Origin, destination and transit countries
- Official dataسارية
The route runs from the Iranian network (Tehran–Tabriz) to the Razi border station, then Kapıköy and Van in Turkey. The Tehran–Van passenger train uses this path via Tabriz.
Date: 2025-03-10 — Authority: Islamic Republic of Iran Railways (RAI)
- Official dataسارية
Rail freight to Iran and beyond crosses Lake Van in Turkey on the train ferries Sultan Alparslan and İdris-i Bitlisi.
Date: 2025-01-27 — Authority: Türkiye Ministry of Transport and Infrastructure
- Analysisبحاجة إلى تأكيد من جهة رسمية
The onward Turkey–Europe leg (including the Marmaray tunnel in Istanbul) was not confirmed by a reliable source in this research; needs confirmation from the official authority (TCDD).
Main stations and network connections
- Official dataسارية
Main stations named in sources: Tehran, Tabriz, Razi (Iranian border), Kapıköy (Turkish border) and Van.
- Reported practiceمقترحة
Completing the Marand–Maku and Bazargan–Cheshmeh Soraya links, extending to Kars in Turkey, is described as needed to divert corridor cargo; these lines are not yet in operation.
Date: 2025-12-04
Rail border crossings, track gauge and transfer method
- Official dataسارية
The rail crossing is Razi–Kapıköy. Iranian customs and passport formalities take place at Razi station, and a Turkish locomotive takes over at Kapıköy.
- Analysisسارية
Iran and Turkey both use 1,435 mm standard gauge, so no bogie exchange is needed at this border. The break in the rail haul on this route is the train-ferry crossing of Lake Van.
Wagons vs containers, cargo types and capacity
- Official dataسارية
Turkish Ministry of Transport figures for the Lake Van ferries in 2024: 476,717 tonnes (up 68% on 2023), 15,471 wagons and 364 voyages. These are totals for the lake; the Iran-bound share is not published separately.
Date: 2025-01-27
- Official dataسارية
Main exports moved by these ferries: MDF, zinc ore, iron and steel products, food, grain and chemical products bound for Iran and beyond.
| Year | Cargo (t) | Wagons | Voyages |
|---|---|---|---|
| 2023 | 283,459 | 13,549 | 290 |
| 2024 | 476,717 | 15,471 | 364 |
Total Lake Van train-ferry cargo (Sultan Alparslan and İdris-i Bitlisi), not Iran-only; source: Türkiye Ministry of Transport via media.
Transit time
- Official dataسارية
The Tehran–Van passenger train takes about 22 hours including customs at Razi and Kapıköy (reported). No reliable source was found for freight transit time.
Costs and how to obtain a quote
- Analysisبحاجة إلى تأكيد من جهة رسمية
No published official tariff for Iran–Turkey freight was found. For quotes, contact RAI's international commercial department, the Turkish rail operator (TCDD Taşımacılık) or licensed rail freight forwarders.
- Reported practiceسارية
Iran, China, Uzbekistan, Turkey, Turkmenistan and Kazakhstan agreed in Istanbul to apply unified tariffs on the China–Europe southern corridor.
Date: 2025-12-04
Responsible companies and organisations
- Official dataسارية
Islamic Republic of Iran Railways (RAI) is the Iranian infrastructure manager and counterpart; passenger tickets are sold through Raja. In Turkey, the Ministry of Transport and Infrastructure reports on the Lake Van ferries.
Current status and disruptions (2025–2026)
- Official dataسارية
The Tehran–Van passenger train resumed in March 2025 after a five-year suspension, with two departures per week.
Date: 2025-03-10
- Reported practiceسارية
In April 2026, after strikes on railway bridges, Iran's railway director said Tabriz trains had resumed after a four-to-five-day interruption and a Tehran–Tabriz–Van train departed on rebuilt tracks.
Date: 2026-04-14
- Reported practiceبحاجة إلى تأكيد من جهة رسمية
A 27 April 2026 Maritime Executive report says the Van–Tabriz route was disabled by bridge strikes and services 'do not appear to have yet resumed'. This conflicts with the resumption report; check current freight status with RAI.
Date: 2026-04-27
- Official dataسارية
Iran's total international rail freight reached 5 million tonnes by 24 February 2026 (up 7%); no breakdown for the Turkey route was published.
Date: 2026-02-25
Transit restrictions and documents
- Official dataسارية
According to OTIF's official member list, Iran is a COTIF member state; the CIM Uniform Rules (rail freight contract) apply between COTIF states. Türkiye is also listed as an OTIF member, so Iran–Turkey shipments normally move on a CIM consignment note (confirm with the operator).
Authority: OTIF
- Analysisسارية
A TIR Carnet is a road customs-transit document and does not replace the rail consignment note (CIM/SMGS) or the rail customs transit declaration. Confirm Iranian customs transit documents with Iran Customs (IRICA) or a licensed customs broker.
- Official dataسارية
On 1 October 2026 the U.S. Treasury's OFAC added the Islamic Republic of Iran Railway Company, Raja Passenger Trains Company and an entity registered as Sherkat-E Rah Ahan-E Khamle-O-Naghle to its sanctions list under Executive Order 13902. Treasury said Iran was using rail to move oil and sustain regional trade under the maritime blockade. Obtain sanctions legal advice before any freight contract or payment involving Iranian railways.
Document: E.O. 13902 — Date: 2026-10-01 — Effective: 2026-10-01 — Authority: U.S. Treasury / OFAC
Trader checklist
- Check current status of the Tabriz–Razi line with RAI before booking.
- Ask the Turkish operator about Lake Van ferry capacity and slots.
- Confirm the consignment note (CIM) and customs transit documents.
- Obtain sanctions legal advice before contracting.
Frequently asked questions
- Is bogie exchange needed at the Iran–Turkey border?
- No; both countries use 1,435 mm standard gauge. The break in this route is the train-ferry crossing of Lake Van.
Sources
- Tehran Times(2025-03-10)Iranian state-affiliated media
- Haberler.com (citing Türkiye's Ministry of Transport)(2025-01-27)News media
- Dawn (agencies)(2026-04-14)News media
- The Maritime Executive(2026-04-27)News media
- Eghtesad Online(2025-12-04)News media
- OTIF (Intergovernmental Organisation for International Carriage by Rail) - member states list(n.d. (accessed 2026-11-11))Official
- U.S. Treasury, Office of Foreign Assets Control (OFAC)(2026-10-01)Official
- U.S. Department of the Treasury (press release: Operation Economic Outcast Targets Iran's Remaining Industrial Lifelines)(2026-10-01)Official
- Tehran Times(2026-02-25)Iranian state-affiliated media