Global Giti
المسارات السككية والممرات التجارية لإيران

Iran–Russia rail routes (INSTC)

Iran–Russia rail freight uses two routes: the eastern branch via Kazakhstan and Turkmenistan (operating) and the western branch via Azerbaijan to Astara, which is incomplete because the 162 km Rasht–Astara line is missing. Rasht–Astara construction has not started and, per the latest report (October 2026), is planned for 2027. The Caspian sea route complements these but is constrained by vessel shortages and falling water levels.

النشر: آخر مراجعة: حالة المعلومات:سارية

Confidence: Medium

التفاصيل معروضة بالإنجليزية إلى حين توفر ترجمة عربية مراجعة.

الخطوط العاملة والخطوط ذات الخدمة المحدودة والمشاريع قيد الإنشاء والمقترحات مصنفة بشكل منفصل؛ لا يُعرض أي مسار مقترح كمسار عامل. تحقق من وضع المسار لدى السكك الحديدية أو المشغل قبل الحجز.

Origin, destination and transit countries

Main stations and network connections

  • Reported practiceسارية

    The Qazvin–Rasht line extension to Bandar Anzali opened in June 2024, completing an all-rail link from the Caspian to Bandar Abbas. The remaining missing link is Rasht–Astara.

    Date: 2024-06-19

  • Reported practiceمقترحة

    Rasht–Astara project: 162 km, 8 new stations, 56 trestles, 73 bridges and 30 overpasses; cost €1.6 billion, of which Russia provides €1.3 billion; projected capacity at least 15 million tonnes a year.

    Date: 2026-10-15 — Authority: Russian Railways (RZD)

Rail border crossings, track gauge and transfer method

Wagons vs containers, cargo types and capacity

Transit time

Costs and how to obtain a quote

Responsible companies and organisations

Current status and disruptions (2025–2026)

  • Reported practiceمقترحة

    According to RZD's first deputy CEO (15 October 2026), Russia and Iran hope to start Rasht–Astara construction in 2027 and finish within three years. Surveying was paused during military action and later resumed.

    Date: 2026-10-15

  • Reported practiceسارية

    Russia's transport minister said Russian exports to Iran via the North–South corridor rose more than 56% in January–April 2026.

  • Reported practiceسارية

    On the Caspian sea route, water levels have fallen about 2 m since the 1990s and northern ports now take only about 4,000-tonne vessels; Iranian ships on the Volga have been stranded for days or weeks by low water.

    Date: 2026-09-27

Transit restrictions and documents

Sources

  1. Interfax(2026-10-15)News media
  2. PortNews / SeaNews (citing Russian Railways)(2025-12-24)News media
  3. TASS(June 2026)News media
  4. Al Jazeera(2026-09-27)News media
  5. The Maritime Executive(2026-04-27)News media
  6. RailFreight.com(2024-06-19)News media
  7. The Times of Central Asia (citing ISNA)(2025-11-11)News media
  8. Index 1520 (railway industry portal) - INSTC overview(n.d.)Reference (Wikipedia), last resort
  9. Wikipedia - Organisation for Co-operation between Railways (OSJD)(n.d. (accessed 2026-11-11))Reference (Wikipedia), last resort
  10. OTIF (Intergovernmental Organisation for International Carriage by Rail) - member states list(n.d. (accessed 2026-11-11))Official
  11. U.S. Treasury, Office of Foreign Assets Control (OFAC)(2026-10-01)Official
  12. U.S. Department of the Treasury (press release: Operation Economic Outcast Targets Iran's Remaining Industrial Lifelines)(2026-10-01)Official

Other pages in this section

أعدّه فريق الأبحاث في غلوبال غيتيالمصادر ومنهجية الإعداد