Iran–Iraq rail link (Shalamcheh–Basra)
There is currently no operating rail connection between Iran and Iraq. The 36 km Shalamcheh–Basra line is under construction; an Iranian official put progress at about 70% in September 2026, but other reports suggest early-stage implementation. The line is designed for passengers and pilgrims.
النشر: آخر مراجعة: حالة المعلومات:مقترحة
Confidence: Medium
التفاصيل معروضة بالإنجليزية إلى حين توفر ترجمة عربية مراجعة.
الخطوط العاملة والخطوط ذات الخدمة المحدودة والمشاريع قيد الإنشاء والمقترحات مصنفة بشكل منفصل؛ لا يُعرض أي مسار مقترح كمسار عامل. تحقق من وضع المسار لدى السكك الحديدية أو المشغل قبل الحجز.
Origin, destination and transit countries
- Reported practiceمقترحة
The Shalamcheh–Basra line (36 km) will link southern Iraq with Iran's Khuzestan province.
Date: 2026-09-03
Main stations and network connections
- Reported practiceمقترحة
Once complete, the line will connect to Basra station and Iraq's rail network. A free-trade zone and industrial centre at Shalamcheh are also planned.
- Analysisبحاجة إلى تأكيد من جهة رسمية
Kermanshah–Khosravi and other Iran–Iraq rail links were not confirmed in the sources read; needs confirmation from the official authority.
Rail border crossings, track gauge and transfer method
- Analysisمقترحة
Iraq's rail network is 1,435 mm standard gauge (reference source), so no break of gauge with Iran is expected once complete (analysis).
Wagons vs containers, cargo types and capacity
- Reported practiceبحاجة إلى تأكيد من جهة رسمية
The line is designed to carry passengers and pilgrims; its freight role and capacity were not specified in the sources read.
Transit time
- Analysisمقترحة
The line is not operating; transit time is not applicable.
Costs and how to obtain a quote
- Analysisمقترحة
No tariff exists because the line is not operating.
Responsible companies and organisations
- Reported practiceسارية
Contractor: Spain's Imathia Construcción under a contract with Iraq's Ministry of Transport (late 2025). A delegation of Iranian MPs and deputy ministers inspected the project in September 2026.
Current status and disruptions (2025–2026)
- Reported practiceمقترحة
Shamseddin Hosseini, chair of the Iranian parliament's Economic Commission, put progress at about 70%; demining of 16 km on the Iranian side is complete.
Date: 2026-09-03
- Reported practiceبحاجة إلى تأكيد من جهة رسمية
An August 2026 AGBI report described Iraq as about to 'start work' on its first rail link to Iran, which conflicts with the 70% figure.
Transit restrictions and documents
- Official dataسارية
According to OTIF's list, Iraq's membership is 'suspended'; Iran is a member.
- Official dataسارية
On 1 October 2026 the U.S. Treasury's OFAC added the Islamic Republic of Iran Railway Company, Raja Passenger Trains Company and an entity registered as Sherkat-E Rah Ahan-E Khamle-O-Naghle to its sanctions list under Executive Order 13902. Treasury said Iran was using rail to move oil and sustain regional trade under the maritime blockade. Obtain sanctions legal advice before any freight contract or payment involving Iranian railways.
Document: E.O. 13902 — Date: 2026-10-01 — Effective: 2026-10-01 — Authority: U.S. Treasury / OFAC
Sources
- Shafaq News(2026-09-03)News media
- AGBI(August 2026)News media
- Wikipedia - Iraqi Republic Railways(n.d. (accessed 2026-11-11))Reference (Wikipedia), last resort
- OTIF (Intergovernmental Organisation for International Carriage by Rail) - member states list(n.d. (accessed 2026-11-11))Official
- U.S. Treasury, Office of Foreign Assets Control (OFAC)(2026-10-01)Official
- U.S. Department of the Treasury (press release: Operation Economic Outcast Targets Iran's Remaining Industrial Lifelines)(2026-10-01)Official