Iran–Afghanistan rail route (Khaf–Herat)
The 1,435 mm standard-gauge Khaf–Herat line operates from Khaf to Rozanak station in Herat province (formal opening December 2020). Section 4 to Herat city is under construction; its second phase (47 km) began in September 2025. Turkmen-built 1,520 mm lines to Torghundi and Aqina connect Afghanistan to the CIS network.
النشر: آخر مراجعة: حالة المعلومات:سارية
Confidence: Medium
التفاصيل معروضة بالإنجليزية إلى حين توفر ترجمة عربية مراجعة.
الخطوط العاملة والخطوط ذات الخدمة المحدودة والمشاريع قيد الإنشاء والمقترحات مصنفة بشكل منفصل؛ لا يُعرض أي مسار مقترح كمسار عامل. تحقق من وضع المسار لدى السكك الحديدية أو المشغل قبل الحجز.
Origin, destination and transit countries
- Reported practiceسارية
The Khaf (Iran)–Herat (Afghanistan) line is about 191 km in four sections: sections 1–2 in Iran to the Shamtiq border, section 3 from Shamtiq to Rozanak (61.2 km, through Ghourian district) and section 4 from Rozanak to Herat.
Main stations and network connections
- Reported practiceسارية
Main stations: Khaf, Sangan, Shamtiq (border) and Rozanak (current terminus). Herat is not yet connected.
- Reported practiceسارية
According to Afghan media, the Serhetabat (Kushka)–Torghundi and Imamnazar–Aqina lines were built and are maintained by Turkmenistan; Iranian cargo can reach these points via Sarakhs and the Turkmen network (analysis).
Rail border crossings, track gauge and transfer method
- Reported practiceسارية
The Iran–Afghanistan rail crossing is at Shamtiq. The Khaf–Herat line is 1,435 mm standard gauge, so there is no break of gauge between Iran and Rozanak.
- Analysisبحاجة إلى تأكيد من جهة رسمية
The Turkmen-built Torghundi and Aqina lines are 1,520 mm; Iranian cargo on this path faces gauge changes at Sarakhs and possibly at the Turkmen–Afghan border (analysis; needs confirmation from the official authority).
Wagons vs containers, cargo types and capacity
- Reported practiceسارية
The line is designed for a 25-tonne axle load. The first trial freight train on 2 December 2020 carried 500 tonnes of cement from Khaf to Rozanak.
Date: 2020-12-02
- Analysisبحاجة إلى تأكيد من جهة رسمية
2025–2026 freight volume figures conflict between Iranian, Taliban and international media sources, and none has been independently audited.
Transit time
- Analysisبحاجة إلى تأكيد من جهة رسمية
No reliable source was found for freight transit time.
Costs and how to obtain a quote
- Analysisبحاجة إلى تأكيد من جهة رسمية
No published tariff was found. Request quotes from RAI and the Afghanistan Railway Authority, or forwarders active at Rozanak.
Responsible companies and organisations
- Reported practiceسارية
Sections 1–3 were funded by Iran. Phase 2 of section 4 is being built for Afghanistan's Ministry of Public Works by Afghan Gama and a Russian company.
Current status and disruptions (2025–2026)
- Reported practiceسارية
Operating: Khaf–Rozanak (formal opening December 2020).
- Reported practiceمقترحة
Under construction: section 4 phase 2 (Robat Paryan–Herat industrial area and airport, 47 km, budget over $54 million) since September 2025 with a 35-month deadline. Phase 1 status (Rozanak–Robat Paryan, 43 km) was not confirmed in the sources read.
Date: 2025-09-18
- Reported practiceمقترحة
Proposed: a Kazakhstan–Afghanistan protocol for a Torghundi–Herat–Kandahar–Spin Boldak line, and Uzbek studies for a 657 km Hairatan–Herat line.
- Analysisبحاجة إلى تأكيد من جهة رسمية
No reliable report of 2026 war disruption on the Khaf–Herat line was found.
Transit restrictions and documents
- Official dataسارية
According to OTIF's official member list, Iran is a COTIF member state; the CIM Uniform Rules (rail freight contract) apply between COTIF states. Afghanistan is also listed as an OTIF member.
Authority: OTIF
- Reported practiceسارية
Afghanistan's OSJD membership and accession to SMGS were approved in June 2014.
- Official dataسارية
On 1 October 2026 the U.S. Treasury's OFAC added the Islamic Republic of Iran Railway Company, Raja Passenger Trains Company and an entity registered as Sherkat-E Rah Ahan-E Khamle-O-Naghle to its sanctions list under Executive Order 13902. Treasury said Iran was using rail to move oil and sustain regional trade under the maritime blockade. Obtain sanctions legal advice before any freight contract or payment involving Iranian railways.
Document: E.O. 13902 — Date: 2026-10-01 — Effective: 2026-10-01 — Authority: U.S. Treasury / OFAC
Sources
- Andrew Grantham - Railways of Afghanistan (Khaf-Herat page)(n.d. (updated after 2025-09-14))Reference (Wikipedia), last resort
- Global Railway Review(2025-09-18)News media
- Kun.uz(2025-02-25)News media
- Amu TV(n.d.)News media
- OTIF (Intergovernmental Organisation for International Carriage by Rail) - member states list(n.d. (accessed 2026-11-11))Official
- Wikipedia - Organisation for Co-operation between Railways (OSJD)(n.d. (accessed 2026-11-11))Reference (Wikipedia), last resort
- U.S. Treasury, Office of Foreign Assets Control (OFAC)(2026-10-01)Official
- U.S. Department of the Treasury (press release: Operation Economic Outcast Targets Iran's Remaining Industrial Lifelines)(2026-10-01)Official