Cement and clinker: types, packaging, testing and routes
Cement is traded as finished cement (bagged, in big bags or in bulk) and as clinker, the intermediate product that is ground into cement. Buyers specify the type and strength class under a named standard such as EN 197-1 or ASTM C150. This page covers specifications, handling, testing, documents and regional trade, based on sources published up to November 2026.
Published: Last reviewed: Information status:Current
HS codes
- 2523.10 Cement clinkers
- 2523.21 Portland cement: white cement, whether or not artificially coloured
- 2523.29 Portland cement: other (grey Portland cement)
Types and specifications
- EN 197-1 groups common cements into five main types: CEM I (Portland cement), CEM II, CEM III (blast furnace cement), CEM IV (pozzolanic cement) and CEM V (composite cement).
- EN 197-1 strength classes 32.5, 42.5 and 52.5 refer to the minimum compressive strength after 28 days. The suffix N means normal early strength, R high early strength, and L low early strength (CEM III only).
- ASTM C150 covers Portland cement types including Type I (general use), Type II (moderate sulfate resistance), Type III (high early strength), Type IV (low heat of hydration) and Type V (high sulfate resistance), plus air-entraining versions IA, IIA and IIIA.
Packaging and shipping
- Paper sacks are easy to handle by hand but slow to load and prone to tearing; shippers have historically supplied spare empty sacks of about 3% of the filled bags for repacking.
- Big bags of about 1 to 1.5 tonnes (some up to about 3 tonnes) reduce the number of lifts; cheaper polypropylene bags can split during discharge.
- Bulk cement is handled pneumatically and must stay completely dry; holds must be clean, dry and free of odours and residues. Bulk cement can settle after loading, so loaded volume and quantity must allow for it.
- Clinker is less sensitive to moisture than cement but generates heavy dust, and local port dust rules can affect loading rates.
Quality testing and inspection
- ASTM C150 refers to chemical analysis (for example magnesium oxide, sulfur trioxide and the main clinker compounds) and physical tests including compressive strength, fineness, setting time, autoclave expansion, air content, heat of hydration and sulfate resistance.
- Under EN 197-1 the strength class is based on 28-day compressive strength; ask for test results for the delivered lot, not only a product data sheet.
- For bagged cement, include a bag count and bag-weight check in the inspection scope.
Documents
- Commercial invoice and packing list (number of bags or big bags, net and gross weights).
- Certificate of origin.
- Bill of lading for sea; consignment note (CMR) for road; rail waybill for rail.
- Mill test certificate or certificate of quality stating the type and strength class under the named standard.
- Some importing countries require additional special documents; check with the buyer before shipment.
Regional trade flows
Afghanistan is a growing cement market. Global Cement reported in February 2026 that Iranian, Tajik and Uzbek producers are targeting it, that the Afghanistan–Pakistan border closure in October 2025 hit trade, and that new Afghan plants with Turkish, Chinese, Qatari and UAE participation are planned with a combined capacity of about 9 million tonnes per year.
For Iran-origin cement and clinker, sanctions and export-control rules depend on the counterparty, product, bank and route and must be checked for each deal. This page is not legal advice.
Buyer checklist and common risks
- Specification: name the standard, type and strength class (for example CEM I 42.5R or ASTM C150 Type II).
- Moisture: wet cement hardens and is lost; check covered transport and storage.
- Weight and count: torn bags cause shortages; agree tolerance and how spare bags are handled.
- Age: ask for the production date and agree the maximum time between production and delivery.
- Payment: on Global Giti the funds are held in escrow with a licensed saraf and released after delivery is confirmed.